Back to Case Studies
Victoria
Ongoing
Work Zone Safety

Smart Work Zone Monitoring – Level Crossing Removal Project

Client: Level Crossing Removal Project (VIDA)

1
Worker Alert Site
8
Worker Alert Cameras
~200ms
Detection Latency
95%+
Detection Accuracy
1
Vehicle Crossing Site
4
Vehicle Crossing Cameras
4s
Crossing Alert Latency
Smart Work Zone Monitoring – Level Crossing Removal Project

The Challenge

The Level Crossing Removal Project (VIDA) required real-time hazard detection and immediate notification systems to minimise high-risk interactions between workers and vehicles at construction sites, while also enhancing safety at construction site crossings.

Our Solution

Real Time Traffic deployed an integrated solution combining Realite Safety Cameras with edge computing for sub-second hazard detection (Worker Alert POC) and cloud-based processing for vehicle crossing alerts. The system includes wearable LED technology and flashing LED warning lights for immediate notifications.

Implementation Details:

  • Worker Alert POC: 1 site with 8 cameras in Pakenham, Victoria
  • Vehicle Crossing Alert: 1 site with 4 cameras
  • Integrated Jetson edge computing devices for sub-second processing
  • LED-equipped hard hats for visual worker notifications
  • Cloud-based vehicle detection with alert activation
  • Flashing LED warning lights at strategic crossing points

Results

Worker Alert: Detection latency of approximately 200 milliseconds achieved
Worker Alert: Detection accuracy rate of over 95% maintained
Vehicle Crossing: Latency reduced from 12 seconds to 4 seconds
Near-miss events detected and analysed
Exclusion zone monitoring implemented
Plant-worker interactions tracked
Productivity tracking enabled (Worker Alert)
Crossing compliance tracking implemented (Vehicle Crossing)
Speed compliance monitored (Vehicle Crossing)

Long-term Impact

The Worker Alert system's sub-second processing speed, achieved through edge computing, provided immediate feedback to workers entering danger zones. The Vehicle Crossing Alert system's optimised 4-second delay provided sufficient time for workers and drivers to respond before vehicles reached crossings. Both systems demonstrated the capacity for effective detection and alert delivery, enhancing construction site safety for the Level Crossing Removal Project.

Interested in Similar Results?

Let's discuss how Realite can address your road safety challenges.